PROJECTS TO DATE

Genergy Electrical Limited is proud to showcase a wide diverse project portfolio that covers a multitude of commercial and residential projects that span across every possible electrical engineering service provision.

2022

Plastics Manufacturing Plant, Mtwapa.

Electrical Installation of 1600A Main Switch Board, Distribution & Control Panels, Motor Control Centres, Compressors, Chillers, Driers, 2 x 1000kVA Backup Generators & structured cabling.

2022

Off-Shore Power Solar Plant.

5kW OffGrid Solar & Lithium Power plant. Design and assembly of a marine-rated power plant to provide power supply to an LPG receiver jetty.

2021/2022

Chuka/Kigere/Kionundu Water Supply Infrastructure, Chogoria.

Tana Water Services Board

Supply & installation of Main Distribution Panels, Control Panels, Motor Control Centres, and cabling works to pumping station and treatment works.

2022

400kW Battery Breaker Machine.

Design and installation of the electrical distribution system for a 400kW automated battery breaker machine, automatic changeover panel, LV cabling and cable management.

2021/2022

Earthing Networks for 80MW Substation, Water Treatment Plant, Water Reticulation Facility, MV Distribution Cabins.

Extensive earthing network installations, exothermic welding, terminal busbars, earth testing

2021/2022

Kimugu Treatment Works, Kericho.

Lake Victoria South Water Service Board

Supply of Main Distribution Panels, Control Panels, Motor Control Centres, Annunciator Panels and cabling works to pumping station and treatment works. Electrical Executions to engineer offices, operator stations, staff houses.

2020/2021

Export Processing Zone; UAL Ruaraka Dry Processing Factory.

Turn key electrical installations for garment production and processing factory rated at 2.5mW. Medium Voltage & Low Voltage distribution, structured cabling, 12kV Ring Main Units, Distribution transformers, Switchboards and small power installations.

2019

Automated MF Battery Assembly Line.

Turn-Key installation to new automated Battery Assembly Line. Design and integration of structured cable support system & switchboards, for assembly line and fume extraction system. Supply, installation and commissioning of equipment for new 4mVA Medium Voltage line.

2021

12kW Pure Hybrid Solar Power Plant - Residential Homes.

12kW 1 Phase Plant coupled to 5KWpv Solar Power and 1200Ah battery set to operate as Hybrid/ Backup system.

2021

10kW Pure Hybrid Solar Power Plant - Residential Homes.

10kW 3Phase System coupled to 7KWpv Solar Power and 2000Ah battery set to operate as Hybrid/ Backup system.

2019

Crusher Quarry for Impresa Costruzioni Maltauro Spa - Malili Main Plant

Main Distribution Panels, Control Panels, Sub-Distribution works and cabling works including design and integration of an automated PLC logic for the operation of the plant. Carrying out all associated LV power cabling works, security lighting.

2019/2020

Kisii & Nyamira Water Supply Project Kegati & Bobaracho Pumping Station Works.

Supply & Installation of Main Distribution, Control, Sub-Distribution, MCC Panels. Supply and installation of PB stations, Instrumentation float switches, level electrodes. Carrying out associated LV power cabling works, electrical distribution work, small power & lighting installation, street lighting and outdoor security lighting.

2019-2020

Konza Technopolis City, KoTDA, Electrical Installations.

Electrical installations to the contractors Base Camp, Water Treatment Plants, Sewage Treatment Plants, Office Block, Asphalt and Batching Plants. Low Voltage distribution and street lighting installations.

2021

40kW Photovoltaic Grid Tie System, Thigiri Ridge, Nairobi.

Design and installation of Grid Tie Solar Power Solution to 2 no. Residential/ commercial buildings, Integrated with Smart Metering.

2018

Eldoret Water Supply Project - Ellegiririni Pipeline and Expansion of Kapsoya/ Naiberi Treatment Works.

Supply & Installation of Main Distribution, Control, Sub-Distribution, MCC Panels. Supply and installation of PB stations, Instrumentation float switches, level electrodes. Carrying out all associated LV power cabling works, electrical distribution work, small power & lighting installation, street lighting and outdoor security lighting.

2018

Isebania and Keroka Water Supply and Sanitation Projects.

Installation of Main Distribution, Control, Sub-Distribution, MCC Panels. Supply and installation of PB stations, Instrumentation. Carrying out all associated power cabling works, electrical distribution work, small power & lighting installation, street lighting and outdoor security lighting.

2017

Electrical Installations to new meat processing plant: 2017

Installation of 1600A Main LV Switchboards, Mains and Submains cabling to factory loads and small power & lighting works.

2015/2016

MicroGrid PV Solution for 2 no. Townhouse.

15kWpv Off Grid Solar plant coupled to 15kWpv String inverters for MicroGrid operation, providing emergency backup and 60% off-grid operation.

2016

Residential Project.

Electrical Design and installation for 2 Private Residences with Level 3 Smart Home integration. 10kw Grid Tied Inverter provision, Solar Heating Installations, CCTV, and Automated Security Control.

2016/2017

New Steel Fabrication Plant, Isinya.

Installation of 2500A Main LV Switchboard, Essential Power Supply Panels,

Lighting Panels, Welding Turrets and Distribution Boards.

Highbay Lighting and Security Lighting Installations. Small Power & Lighting Installations to Office Block, Canteen, Services Areas and Common Areas.

2016/2017

Expansion of Existing Factory.

Power Supply and distribution to new Lead Pot Heaters and Casting Machines. Small Power and Lighting installations to new warehouses, office block, canteens, staff changing rooms and new weighbridge. Design and Installation of Motor Control Center for operation of new plant.

2016

Electrical Installations.

Power Supply and Distribution to new sewing sections, cutting departments

and finishing areas. Rehabilitation of existing 11kV cables and LV equipment.

2016

New Manufacturing Equipment Installation.

Structured cabling works and power distribution to new Soap Lines, Edibles departments. Compressor installations and Power Systems Maintenance. Rehabilitation of existing 11kV cables and LV equipment.

2015/2016

Factory Reorganisation.

Installation and reorganisation of 4 no. 1000kVA Transformers and Ring Main Units. MV Cable terminations, Meggar testing and cable management. Reorganisation of LV distribution for new manufacturing department and assembly plant.

2015

Liquid Telcom Data Centre.

Installation and commissioning of Phase 2 of works. 11kV RMUs and transformer installations, structured cabling to new isolation transformers, voltage stabilizer units, UPS's, switchboards, server cabinets. Installation of battery racks for UPS's. Installation of Bus Track (bus bar) power distribution system. Extensive earthing grid installations.

2015

East African Breweries Ltd 6MW Generator Power Plant.

Installation and testing of 4 x 1500kVA/11kV containerised Generator sets, complete with mechanical works for fuel and exhaust systems. Installation and commissiong of 11kV switchgear, MV cable terminations. Small Power and Lighting installations.

2013, 2014

The Abedares Hills Golf Resort.

Supply and installation of Main Switchboards, LV supply to show homes, sales offices & services buildings. Interior electrical works including supply of light fittings and automated switching facilities.

Design and proposal for MV power supply, 11kV switchgear, RMUs, Transformers, LV switchgear and cabling works for 184 homes.

2013

Battery Manufacturing Plant, Kampala Road, Ind. Area (TurnKey).

Design and installation of new Oxide Mill Plant, Silos, Conveyors

Electrical power supply & distribution to 3 no. mill machines. Structured cabling provisions and terminations for control and signal cables.Small power and LED high bay lighting installations. Fire Alarm Installation. LED high bay and LED tube lighting for entire plant.

2012

Battery Manufacturing Plant, Kampala Road, Ind. Area.

Power supply, distribution and associated tray work:

Electrical power supply & distribution to 2 no. battery assembly plants

consisting of 8 no. machines each. Specialised suspended corrosion-proof cable tray and trunking installations. Supply and installation of new sub-boards, and distribution boards. Supply and installation of high and low bay LED lighting system for entire plant.

2011/2012

Electrical Installation works to new Feed Mill (TurnKey).

Turn Key application for and provision of main grid power. Installation of main switchboard, sub-boards, distribution boards, MCC panel and associated cabling. Interconnection of PLC control system. Related impulse line work, tray and trunking work, motor and conveyor connections. Carrying out earthing of plant. Small power and lighting.

2012

Rehabilitation of Baricho Intake Works.

Upgrading of Main Distribution Board. Supply and installation of Distribution Board and Motor Control Centre and associated cabling. Supply and installation of PB stations, Instrumentation. Carrying out all associated power cabling works, electrical distribution work, small power & lighting, street lighting and outdoor security lighting.

2014

Mumias Water Supply Project, Treatment Works.

Application for and provision of Main power supply from Kenya Power. Supply and installation of Main Distribution, Control, Sub-Distribution, MCC Panels. Supply and installation of PB stations, Flow switches, Instrumentation. Carrying out all associated power cabling works, electrical distribution work, small power & lighting installation, street lighting and outdoor security lighting. Carrying out earthing of works. Generator installation.

2010/2011

Kengen Garissa Power Station, Phase 2.

Electrical installation of 2 x 1.5MVA CAT 750RPM Generator sets:

Associated HV/MV cabling, support structure works, tray & ladder works,

terminations, MV switchgear installation, transformer connections,

control cabling. Small power & lighting. Interconnection to existing plant.

2010

ABM Limited, Kampala Road, Ind. Area.

Electrical Installation to 2 x 650kVA CAT Generator Sets:

Associated HV cabling, terminations, installation of synchronising & AMF panels, earthing works and complete fuel line works.

2010

Battery Manufacturing Plant, Kampala Road, Ind. Area.

New Electrical Installation to entire plant:

Installation of new main switchboard, HV breakers, 2 no. transformers, structured cabling with extensive tray, trunking and cable ladder work. Reorganisation and re-routing of existing cable. Supply and installation of new sub-boards. Fire Alarm Installation.

2009

Woodwork Factory, Mombasa Road (TurnKey)

Electrical installation to new machines, workshops:

Cabling to new machines, electrical reorganisation for existing machines, supply and installation of new sub-boards, associated cabling and traywork. Lighting for outdoor workshop.

2009

Mumias Sugar Factory, Mumias.

Electrical & mechanical installation of 1000kVA CAT generator & 3.3kV breaker. H.V. Terminations & Cabling.

2009

Cotton Ginnery, Lunga Lunga Rd.

Electrical installation to new machines:

Complete electrical installation to new plant, cabling to machines, fans, motors. HV & LV cabling.

2009

Ink Manufacturing Plant , Lunga Lunga Rd.

Electrical installation to machines. Installation of flame proof fittings, boards, armoured cabling, tray work, Power Factor Correction plant.

Plastic Bag Manufacturing Plant.

Electrical installation to machines. Switchboards, sub-boards,

cabling, earthing:

Installation of main switchboard & sub-boards. Complete power and instrument cabling. Cable tray and cable ladder installations, lighting and earthing. Installation of new 250kVA CAT generator set, including fuel lines, water lines and exhaust work.

New Dry Fractionation Plant.

Electrical installation and cabling to the entire plant & testing:

Electrical and instrumentation installation, complete cabling and termination works, fabrication & installation of structural steel supports for cable ladders and trays. Instrument mounting and related impulse line work.

Sony Sugar Factory, Awendo.

Complete Electrical and mechanical installation of 1x 1500kVA generator set, transformer and switchgear:

Transport of materials to site, off-loading and positioning of Gensets. Fuel supply & exhaust system installations, cabling and testing. Stepping up from 415V to 6600V. Synchronising with existing panels.

Newspaper Printing Press, Mombasa Road, Nairobi

Complete electrical installation for entire new press:

Power supply to complete printing press, stand-by generator installation, switchboards, lighting, cabling & fire-alarm installation.

Crusher Plant, Mai Mahiu - Narok Road.

Electrical installation of crusher, asphalt plant & control rooms

Road Works Main Camp, Mai Mahiu - Narok Road.

Main power supply, installation and supply of main switchboard, cabling and lighting to the entire camp, workshops and houses. Automatic backup generator supply & installation.

Kengen Lamu Power Station, Lamu.

Transport, complete Electrical and mechanical installation of 2x 650kVA CAT generator sets:

Fuel supply & exhaust systems, electrical installations, Synchronising to the existing station, cabling and testing.

Kengen Garissa Power Station.

Electrical & mechanical installation of 1000kVA CAT

generator set:

Fuel supply & exhaust system installations, cabling and testing. Stepping up to 11kV and interconnecting existing plant.